Skip to content
Mendocino Coast Property

Mendocino Coast Property

Design Build Transform

Primary Menu Mendocino Coast Property

Mendocino Coast Property

  • Real Estate News
  • House for Rent
  • Construction
  • Furniture
  • Apartment
  • Building
  • About Us
    • Advertise Here
    • Contact Us
    • Privacy Policy
    • Sitemap
  • Home
  • No reason to reverse Oxford Street M&S demolition decision, says mayor | News
  • Construction

No reason to reverse Oxford Street M&S demolition decision, says mayor | News

Rickey Andreu April 13, 2022

[ad_1]

The mayor of London will not intervene in controversial plans to demolish a 1930s Marks & Spencer store on Oxford Street.

Earlier this month, Sadiq Khan said he would review his stage two planning decision on the Pilbrow & Partners scheme after it emerged the Greater London Authority had not considered a critical report from its own climate advisor.

But a spokesperson for the mayor today announced that it would allow Westminster City Council – which approved the plans last November – to determine the application.

Pilbrow &  Partners' proposals for the Marble Arch branch of Marks & Spencer

The plans for the site would see the Art Deco-style Orchard House building demolished along with two other connected structures, to be replaced with a 10-storey office-led development.

In a report commissioned by SAVE Britain’s Heritage, Simon Sturgis, the GLA’s carbon advisor, claimed the carbon emissions expected to result from the scheme would mean Westminster could not meet its climate change targets.

Sturgis’ report said that just under 40,000 tonnes of CO2 would be released during construction, with just under 53,000 tonnes in embodied carbon cost over the course of 60 years.

A spokesperson for the mayor said that after a “thorough assessment”, including the total carbon footprint of the project, it was determine that there were no grounds for intervention.

“The mayor can only intervene in council planning decisions where the proposed scheme does not conform with the London Plan,” the spokesperson added.

Only Michael Gove, secretary of state for the Department of Levelling Up, Housing and Communities, can now stop the plans from going ahead.

The existing six-storey building was designed by Trehearne & Norman and built speculatively by construction firm Thomas & Edge, with the retail giant taking over the entire building in 1967.

The Marble Arch branch of Marks & Spencer, seen from the east

The new development will see Oxford Street linked with Granville Place to the building’s north by a new arcade.

It will have a gross internal area of 60,777 m2 – nearly double the existing floorspace – although the amount of retail space will decline.

M&S will retain retail space on the ground, first and lower ground floors of the new building, which will be a mixed-use building featuring retail, office and restaurant space.

[ad_2]

Source link

Post navigation

Previous: A’Ibom Gov Rates VKS Construction High on Capacity, Project DeliveryT
Next: Tackling fans, baseboards, light fixtures, furniture

More Stories

Revolutionizing the Skyline: Cutting-Edge Construction Methods Shaping Tomorrow's World
  • Construction

Revolutionizing the Skyline: Cutting-Edge Construction Methods Shaping Tomorrow’s World

Rickey Andreu September 4, 2026 0
Top 10 Construction Industry Trends Shaping the Future of Building in 2024
  • Construction

Top 10 Construction Industry Trends Shaping the Future of Building in 2024

Rickey Andreu September 2, 2026 0
The Future of Building: How Cutting-Edge Construction is Reshaping Cities
  • Construction

The Future of Building: How Cutting-Edge Construction is Reshaping Cities

Rickey Andreu August 31, 2026 0

Categories

  • 22betlogin.site_200
  • Apartment
  • Building
  • casino ch
  • Construction
  • Furniture
  • House for Rent
  • Lina Steiner
  • Real Estate
  • Real Estate News
  • Sat AT
  • uncategorized

Archives

Recent Posts

  • Nika casino overzicht: Mobiel spelen en accountfuncties: een uitgebreid overzicht van de belangrijkste punten
  • Le zeus Casino Ervaring en Aanbod: Spelervaring bij Le zeus: een praktisch overzicht van de essentiële informatie
  • Onze casino-ervaring bij Bet365: Speelervaring op alle apparaten
  • Online casino — Igobet: ons spelaanbod, bonussen en betaalervaring: Accountfuncties en ondersteuning
  • Online casino — Moonprincess100: KYC en accountcontroles: Valutapplicaties

BL

You may have missed

Nika casino overzicht: Mobiel spelen en accountfuncties: een uitgebreid overzicht van de belangrijkste punten
  • Building

Nika casino overzicht: Mobiel spelen en accountfuncties: een uitgebreid overzicht van de belangrijkste punten

Rickey Andreu October 18, 2026
Nika casino overzicht: Mobiel spelen en accountfuncties: een uitgebreid overzicht van de belangrijkste punten
  • Building

Le zeus Casino Ervaring en Aanbod: Spelervaring bij Le zeus: een praktisch overzicht van de essentiële informatie

Rickey Andreu October 18, 2026
Onze casino-ervaring bij Bet365: Speelervaring op alle apparaten
  • Building

Onze casino-ervaring bij Bet365: Speelervaring op alle apparaten

Rickey Andreu October 18, 2026
Onze casino-ervaring bij Bet365: Speelervaring op alle apparaten
  • Building

Online casino — Igobet: ons spelaanbod, bonussen en betaalervaring: Accountfuncties en ondersteuning

Rickey Andreu October 18, 2026
Online casino — Moonprincess100: KYC en accountcontroles: Valutapplicaties
  • Building

Online casino — Moonprincess100: KYC en accountcontroles: Valutapplicaties

Rickey Andreu October 18, 2026
mendocinocoastproperty.com | CoverNews by AF themes.

WhatsApp us